PROJECTS & FIELD EXPERIENCE

From the ground
to the worksite

Gold and aggregate mining projects: mine preparation, mineral extraction, loading and haulage.

Explore projects
04SELECTED MINING PROJECTS
Andarian Gold Mine
East Azerbaijan
Shadan Gold Mine
South Khorasan
Sariguni Gold Mine
Kurdistan
Takht-e Aseman Aggregate Mine
Central Iran

SELECTED MINING PROJECTS

Four projects. Four operating environments.

The right role in the mining cycle

Fleet selection depends on material, haul distance, road conditions and production plans. Specifications and supply availability are assessed for each project.

Excavators
01

Excavators

Excavate and load at the mine face. Matching bucket and truck capacity helps coordinate loading cycles.

Mining trucks
02

Mining trucks

Move ore and waste between working faces, stockpiles and delivery points; selected for payload and route conditions.

Graders & support equipment
03

Graders & support equipment

Maintain haul-road surfaces and prepare working areas. Loaders, dozers and water trucks support operations as required.

Excavator
Excavation and loading at the working face.
Mining truck
Ore and waste haulage to stockpiles or delivery points.
Loader
Stockpile loading and material handling around the site.
Dozer
Ground preparation and short-distance material movement.
Grader
Grading and maintaining mine haul-road surfaces.
Water truck
Watering haul routes to reduce operational dust.

DRILLING TRACK RECORD

Experience beyond borders

15 drilling records
Akbastau / Kazakhmys Kazakhstan 2011–2012

Core drilling PQ, HQ and NQ

Rigs
6
Depth
1000 NQ m
Year
2011–2012
Conrad / Kazakhmys Kazakhstan 2010–2011

Core drilling and reverse circulation

Rigs
8
Depth
700 NQ m
Year
2010–2011
Mizek / Kazakhmys Kazakhstan 2012

Exploration core drilling

Rigs
2
Depth
500 HQ m
Year
2012
Artymovskiy / Kazakhmys Kazakhstan 2013

Core drilling HQ3 and NQ3

Rigs
2
Depth
300 HQ3 / 450 NQ3 m
Year
2013
Botakara / Kazakhmys Kazakhstan 2013

Exploration core drilling

Rigs
2
Depth
1250 NQ m
Year
2013
Bozshakol / KAZ Minerals Kazakhstan 2017–2020

Exploration HQ3 and NQ3

Rigs
4
Depth
700 NQ m
Year
2017–2020
Bozshakol / KAZ Minerals Kazakhstan 2020

Deep core drilling to 2,000 m

Rigs
2
Depth
2000 NQ m
Year
2020
AltynALMAZ Kazakhstan 2017

Deep core drilling to 1,500 m

Rigs
2
Depth
1500 NQ m
Year
2017
Tin One Mining Kazakhstan 2016

Core drilling PQ3

Rigs
4
Depth
300 PQ3 m
Year
2016
Aydakolskiy Redmet Kazakhstan 2018

Exploration HQ and NQ

Rigs
4
Depth
800 NQ m
Year
2018
Oyu Tolgoi / Ivanhoe Mongolia 2014

Deep directional core drilling to 2,500 m

Rigs
4
Depth
2500 NQ m
Year
2014
South Govi Sands Mongolia 2015

RC and core drilling for coal to 800 m

Rigs
4
Depth
800 RC m
Year
2015
Huren Gol / Rio Tinto Mongolia 2016

RC and core drilling for coal to 400 m

Rigs
2
Depth
400 RC m
Year
2016
Energy Resources Mongolia 2015

Rotary mud drilling, 14-inch holes to 300 m

Rigs
2
Depth
300 m
Year
2015
Almalyk / GOK Almalyk Uzbekistan 2018

Exploration core drilling to 500 m

Rigs
2
Depth
500 HQ m
Year
2018

Start a conversation

Your project comes next

Tell our team about your mine and operational needs

Start a conversation